Construction Management

Construction Management – Steel Reinforcement – Concrete Quantities

  • You are required to estimate steel reinforcement quantities of only one floor and the stage
  • You will receive an independent civil engineering drawing taken from real construction project. you are required to do the following ;
  • Study the drawing (or the specified part ) carefully and understand it
  • Write short essay about the content of the drawings and the related design parts.

-Make a short Discussion on the presented work

  • Perform only a material quantity estimation for the given work
  • Present the work in professional engineering way

This question has been answered.

Get Answer