1- An interior designer has been hired by a restaurant owner for a remodel of the restaurant (interior finishes and furniture). The restaurant Owner requests a change of the floor plan that will require a building permit. The Interior Designer produces the required drawings and asks his/her friend (a local architect) to stamp the drawings before submitting to the city.
What should the architects response be?
———————————————————————————
2- see the attached picture
You are a Project Manager at Acme Design Co. and you created the project schedule below for a new restaurant project. You and a draftsperson will each spend 50% of your work hours on this project. Assume 40-hour work weeks, with a typical work week as Monday through Friday.
How many total hours will you and the draftsperson work on this project during Construction Documents?
———————————————————————————–
3- fil with the correct answer
A- Drawings show locations and————————–
B- Specifications describe project ————————————–