a) Using structured layout planning techniques (travel chart, work centre relationship analysis and the materials handling cost equation), prepare a process layout proposal which is safe and attempts to minimise the materials flow between work centres neatly drawn to scale and labelled
b) Prepare a brief report indicating and illustrating the factors you have considered and the contribution of the analysis you have undertaken.
c) Explain the challenges associated with cellularising this facility.