Construction Safety

QUESTION 1

Which of the following is NOT a specification for a limited access zone during masonry wall construction?

On the unscaffolded side of the wall

Established prior to the start of construction

Equal in width to one-half the height of the wall

Run the entire length of the wall
6 points

QUESTION 2

For excavations that are more than 4 feet in depth, what is maximum allowable travel distance to the nearest safe means of egress?

10 feet

15 feet

20 feet

25 feet
6 points

QUESTION 3

In evaluating soil, if the thumb penetrates no further than the length of the thumbnail, it is probably __.

type A soil

type B soil

type C soil

layered geological strata
6 points

QUESTION 4

What is the minimum required clearance when a crane is operating in the vicinity of a 240 kV power line?

10 feet

20 feet

15 feet

25 feet

6 points

QUESTION 5

Hardware used in the lifting precast concrete must be capable of supporting __ times the intended load applied or transmitted.

QUESTION 6

Discuss hazards and precautions to be taken when operating a crane near power lines.

Your response should be at least 75 words in length.

QUESTION 7

Explain how the different types of trenching and excavation protective systems (shielding, shoring, and sloping) are selected based on construction site conditions. Also, please provide a brief description of each type of protective system in your discussion.

Your response should be at least 75 words in length.

QUESTION 8

What is the purpose of conducting an engineering survey prior to a demolition project? Describe and discuss the major components of an engineering survey for the demolition of a two-story wood structure.

Discuss the site evaluation steps that should be taken before starting an excavation project. Which step(s) are likely to contribute the most in preventing excavation injuries? Why?