Description
Maduro Cleaning is a small organization that provides cleaning services to both residential and commercial clients. As a small organization, the owner assigns crews of two, three, or four employees to jobs each morning but the owner does not have a good method of determining a reasonable amount of time that each cleaning should take. The owner decided to keep data on job times and crew sizes in the hopes of developing a productivity measure. In a 4-5 page paper, not including the cover and reference pages, calculate which of the crew sizes has the best productivity per worker, and explain your method. Evaluate your outcome and the possible reasons that would explain those results. Project what the productivity might be for a crew size of five and explain your reasoning.
Crew Size Avg: Productivity per Crew
2: 3765 square meters per day
3: 4915 square meters per day
4: 6309 square meters per day
Be sure to use at least two scholarly, peer-reviewed references in supporting your answer. Current sources are those published within the most recent five-year period, and scholarly sources are those from peer-reviewed journals.
Make certain for each listed reference that you have at least one supporting citation in the body of your content. Your reference page is always the last page of the submission where all individual references get listed. The Saudi Digital Library is a good resource to search for these references. Submit your presentation into the Assignment Dropbox.
It is strongly encouraged that you submit all assignments into the TurnItIn Originality Check prior to submitting them to your instructor for grading. If you are unsure how to submit an assignment into the Originality Check tool, review the TurnItIn Originality Check – Student Guide for step-by-step instructions.