A manufacturing facility that makes steel materials handling devices

A manufacturing facility that makes steel materials handling devices such as hand carts and an assortment of roller carts for moving heavy materials around in manufacturing facilities has decided to start making cantilever storage racking systems. This will require the purchase and installation of a 12-foot hydraulic press brake and a 12-foot shear in the fabrication department along with the necessary tools and dies to bend and punch holes in the rack components that will largely be manufactured from formed sheet metal. Employees have experience working smaller versions of this type of equipment, but room will need to be made and larger pieces of sheet metal will need to be cut and handled. The department will also need to continue to produce existing orders while the new equipment is installed. How can a management of change program be used to reduce risks in such a scenario?