Individual simulation:
Project Activity:
- Identify an industrial process which needs control and develop PLC programming for the same and execute the operation in Festo PLC work bench.
- Provide appropriate Grafcet and Grafcet equation for the application and implement the ladder program.
- Implement Timer functions and Counter functions in the same application simulation.
- Interpret the working of the application with respect to the ladder diagram and get the output verified.
Report requirements
- Submission Date
The submission of the project, report, and presentation must be on 13th week of the term.
Late submission will not be accepted and will merit a zero credit in the Final Exam. - Project flow and Report Format
The following information must be included in your report:
Abstract
Table of Content
List of Figures
List of Tables
LIST OF ABBREVIATIONS
Part 1: Introduction
Part 2: Literature Review
Part 3: Methodology
Part 4: Result and Discussion
Part 5: Conclusions
Part 6: References
Appendix