Comprehensive plan for implementing and managing

 

propose a clear and comprehensive plan for implementing and managing the concept from inception to completion. Although the details of your plan will necessarily depend upon your concept, at a minimum your plan should consider:

Physical and technological resources needed for the concept, including where these will come from and how they will be used to reduce cost or improve operations. Be sure to discuss why one resource option is better than another where appropriate.
A detailed implementation schedule covering what needs to be done, by when, and by whom. The schedule should identify the critical path to success and outline the dependencies between tasks.
Project review processes and indicators of success to ensure that the project stays on target.
An explanation of how intrapreneurship or entrepreneurship factors in to the implementation of the plan and how to protect intangible assets, such as intellectual property or brand.
For additional details, please refer to the Milestone Two Guidelines and Rubric document and the Final Project Guidelines and Rubric document.

Hide Rubrics
Rubric Name: MBA 705 Milestone Two Rubric
This table lists criteria and criteria group names in the first column. The first row lists level names and includes scores if the rubric uses a numeric scoring method. You can give feedback on each criterion by tabbing to the add feedback buttons in the table.
Criteria
Proficient
Not Proficient
Criterion Score
Main Elements
15 points
Includes most of the main elements
0 points
Does not include any of the main elements
Score of Main Elements,/ 15
Critical Thinking
15 points
Provides logical conclusions and defends with examples
0 points
Does not provide logical conclusions
Score of Critical Thinking,/ 15
Physical and Technological Resources
15 points
Provides physical and technological resources and includes a discussion of the source of the resources and why certain options are better than others
0 points
Does not provide physical and technological resources
Score of Physical and Technological Resources,/ 15
Implementation Schedule

 

This question has been answered.

Get Answer