Engineered system in the project/program.

Using the time line process or the course road-map process (CRMP) explained in class; You are required to select a specific Engineered System in any program/project that is a real case or future innovative idea for a system that shall serve the UAE.

Once you gather the required information and data for your system; then you are required to upload your finding in this assignment to include the following:

  1. The problem statement that lead to the initiation of using that specific engineered system in the project/program.
  2. Overview of the project/program including all systems cost, and duration (schedule).
  3. Present the System's Work Breakdown Structure (SWBS) down to the 3ed or 4th level if possible.
  4. Using the SWBS, List all the objectives in a structured tree format. This is going to be under a header called (Objectives Analysis).
  5. Show your references.