Marco Appliances Inherent Risks and Control Design Project

Deliverables include:

  1. Client Acceptance Report: Your report should be between two and three SINGLE-SPACED pages using 1″ margins and 12-point font. (See Sample attached: Engagement letter and Client Acceptance Report Sample)
  2. Draft engagement letter: Your letter should be between one and two SINGLE-SPACED pages using 1″ margins and 12-point font.

This question has been answered.

Get Answer